[ux_slider slide_width=”100%” bullets=”false”]
[ux_banner height=”100%” slide_effect=”fade-in” bg=”1302″ bg_overlay=”rgba(0, 0, 0, 0.3)” bg_pos=”53% 18%”]
[text_box width=”28″ width__sm=”85″ width__md=”52″ scale=”120″ animate=”fadeInLeft” position_x=”100″ position_x__sm=”50″ position_y=”50″ position_y__sm=”50″ text_depth=”1″]
Save Up to
80%
Off Your Electrical Bill
[button text=”Konsultasi Gratis!” color=”white” radius=”10″]
[/text_box]
[/ux_banner]
[/ux_slider]
[section]
[title text=”How The System Work”]
[row width=”custom” custom_width=”80%”]
[col span=”6″ span__sm=”12″ align=”center” bg_color=”rgb(220, 221, 221)”]
[ux_image id=”236″]
[/col]
[col span=”6″ span__sm=”12″ align=”left”]
- Solar Panel
The sun shines on the solar panels generating DC electricity. - Hybird Inverter/Charger
DC electricity is converted into AC electricity using On-Grid Inverter - AC Loads
The AC electricity is used to power appliances in your home - Utility Grid
Electricity can be received and feedback to the grid
[/col]
[/row]
[/section]
[section bg=”1747″ bg_overlay=”rgba(0, 0, 0, 0.35)”]
[row]
[col span__sm=”12″ align=”center” color=”light”]
[title style=”center” text=”Benefit” color=”rgb(255, 255, 255)”]
[/col]
[/row]
[row width=”custom” custom_width=”80%”]
[col span=”3″ span__sm=”6″ align=”center” color=”light”]
[ux_image id=”1130″ width=”30″]
Bill reduction with Net Metering
[/col]
[col span=”3″ span__sm=”6″ align=”center” color=”light”]
[ux_image id=”1126″ width=”30″]
Cleaner, cheaper, and more reliable source of electricity
[/col]
[col span=”3″ span__sm=”6″ align=”center” color=”light”]
[ux_image id=”1125″ width=”30″]
Increasing property value
[/col]
[col span=”3″ span__sm=”6″ align=”center” color=”light”]
[ux_image id=”1124″ width=”30″]
Free power for +25 years
[/col]
[/row]
[/section]
[section visibility=”hide-for-medium”]
[title style=”center” text=”POWER APPLICATION”]
[row]
[col span=”6″ span__sm=”12″]
[gap height=”100px”]
1. Industrial
With the absence of reliable electricity in the area, PLN Gorontalo Biomass Power Plant opts to use 45 kWp Rooftop Ongrid Solar Power System to support its electricity needs. Designed, installed and commissioned on-schedule by PT Selaras Daya Utama in 2014, the project serves as the model to use Solar Power for industrial needs.
[/col]
[col span=”6″ span__sm=”12″]
[ux_image id=”1129″ depth=”1″ animate=”fadeInUp”]
[/col]
[/row]
[row]
[col span=”6″ span__sm=”12″]
[ux_image id=”1128″ depth=”1″ animate=”fadeInUp”]
[/col]
[col span=”6″ span__sm=”12″]
[gap height=”100px”]
2. Commercial Buildings
Aligned with the commitment of PT Pertamina (Persero) to increase the Renewable Energy portion in Indonesiaโs National Energy Mix SEDAYU was chosen to design, install and commission the 189 kWp Solar Power system on top of the twin 9th-storey Pertamina building in Cilacap, Central Java.
[/col]
[/row]
[row]
[col span=”6″ span__sm=”12″]
[gap height=”100px”]
3. Residential Buildings
With the introduction of Net Metering system by PLN where the residential users can put their excess of energy resulted from its rooftop solar system. SEDAYU team installed a 3 kWp rooftop solar system in a residential house in Serpong, Tangerang. Upon successful commissioning, the owner is able to save up to 80% of his electricity bill.
[/col]
[col span=”6″ span__sm=”12″]
[ux_image id=”1127″ depth=”1″ animate=”fadeInUp”]
[gap height=”50px”]
[/col]
[/row]
[/section]
[section visibility=”show-for-medium”]
[title style=”center” text=”POWER APPLICATION”]
[row]
[col span=”6″ span__sm=”12″]
[ux_image id=”1129″ depth=”1″ animate=”fadeInUp”]
[/col]
[col span=”6″ span__sm=”12″]
1. Industrial
With the absence of reliable electricity in the area, PLN Gorontalo Biomass Power Plant opts to use 45 kWp Rooftop Ongrid Solar Power System to support its electricity needs. Designed, installed and commissioned on-schedule by PT Selaras Daya Utama in 2014, the project serves as the model to use Solar Power for industrial needs.
[/col]
[/row]
[row]
[col span=”6″ span__sm=”12″]
[ux_image id=”1128″ depth=”1″ animate=”fadeInUp”]
[/col]
[col span=”6″ span__sm=”12″]
2. Commercial Buildings
Aligned with the commitment of PT Pertamina (Persero) to increase the Renewable Energy portion in Indonesiaโs National Energy Mix SEDAYU was chosen to design, install and commission the 189 kWp Solar Power system on top of the twin 9th-storey Pertamina building in Cilacap, Central Java.
[/col]
[/row]
[row]
[col span=”6″ span__sm=”12″]
[ux_image id=”1127″ depth=”1″ animate=”fadeInUp”]
[/col]
[col span=”6″ span__sm=”12″]
3. Residential Buildings
With the introduction of Net Metering system by PLN where the residential users can put their excess of energy resulted from its rooftop solar system. SEDAYU team installed a 3 kWp rooftop solar system in a residential house in Serpong, Tangerang. Upon successful commissioning, the owner is able to save up to 80% of his electricity bill.
[gap height=”50px”]
[/col]
[/row]
[/section]
[section bg=”1747″ bg_overlay=”rgba(0, 0, 0, 0.35)”]
[row]
[col span__sm=”12″ margin=”50px 0px 30px 0px” align=”center” color=”light”]
Save Up to 80% Off Your Electrical Bill
[button text=”Konsultasi Gratis!” color=”white” size=”large” radius=”10″]
[/col]
[/row]
[/section]
